The year-round 2-chairlift "Szrenica" consists of two sections - "Szrenica I" and "Szrenica II". The lift operates within the Szrenica SkiArena. It is the easiest way to get from Szklarska Poręba to Szrenica. The railway operator is Sudety Lift Sp. z o. o.
The lift was put into operation in 1962 as a single-seater chairlift. It was rebuilt in the early 1990s. After being converted into a 2-seater chairlift, it was put into operation on December 21, 1993. The 6-seater "Karkonosz Express" chairlift, operating in the winter, entering Świąteczny Kamień, also starts from the lower station. Its length is 2,393 m. It overcomes an elevation difference of 508.1 m, transporting 1,985 people per hour.

Technical data:

"Szrenica I" chairlift
Route length [m] 1417
Level of the lower/intermediate station [m above sea level] 710.8
Level of the intermediate/upper station [m above sea level] 884.5
Level difference [m] 173.7
Route supports 16
Transport capacity [people per hour] 1,436

"Szrenica II" chairlift
Route length [m] 1341
Level of the lower/intermediate station [m above sea level] 880.5
Level of the intermediate/upper station [m above sea level] 1309.6
Level difference [m] 429.1
Route supports 14
Transport capacity [people per hour] 1,437